PAVEMENT REHABILITATION – ROAD DESIGN
INDUSTRIAL STEEL CONSTRUCTION – CIVIL CONCRETE CONSTRUCTION

PAVEMENT REHABILITATION ^
MASTER’S DEGREE THESIS – DOWNLOAD

STUDY ON PAVEMENT REHABILITATION WORKS AT THE VALLELUNGA RACE CIRCUIT
THE STUDY, PRECEDED BY THE ANALYSIS OF THE EXISTING PAVEMENT’S CHARACTERISTICS AND BY THE IDENTIFICATION OF ITS RELEVANT DETERIORATIONS, CONSISTED IN THE PROJECT OF THE SUPERSTRUCTURE, THE VERIFICATION OF THE NEW PAVEMENT SYSTEM AND THE CONSEQUENT REALIZATION OF THE CONSTRUCTION SITE. FINALLY, THANKS TO THE USE OF AIMED SOFTWARE SYSTEMS, I FACED THE PROJECT MANAGEMENT PHASE, WHOSE PURPOSE WAS TO ANALYZE THE TECHNICAL, LOGISTICAL AND ECONOMICAL ASPECTS OF THE INTERVENTIONS
SOFTWARE: AUTOCAD, PHOTOSHOP, MICROSOFT PROJECT, ALIZE-LCPC

ROAD DESIGN ^

UNIVERSITY GROUP PROJECT
CONSTRUCTION OF A NEW ROAD IN A HILLY AREA
SOFTWARE: AUTOCAD

DOWNLOAD TECHNICAL REPORT

INDUSTRIAL STEEL CONSTRUCTION ^

UNIVERSITY PERSONAL PROJECT
PROJECT AND STRUCTURAL CALCULATION OF AN INDUSTRIAL STEEL BUILDING
SOFTWARE: AUTOCAD

CIVIL CONCRETE CONSTRUCTION ^

UNIVERSITY PERSONAL PROJECT
PROJECT AND STRUCTURAL CALCULATION OF A CIVIL CONCRETE BUILDING
SOFTWARE: AUTOCAD